Located in Marlim Leste field, at Bacia de Campos (Campos Basin), RJ, 120 km away from the coast, the P 53 will explore oil and gas at 1080 m water depth. The Marlim Leste field is a reserve of 700 million barrels. MNA is supplying Fully Tight Valves of different diameters, pressure classes and steel alloys, including duplex super alloy for the new platform, which is expected to start production in 2008. The produced oil will be pumped to the PRA1 (photo) platform, to which MNA and Valmicro have also supplied ball valves. The gas will be pumped to platform P26.
Lupatech S.A. 2006 - All rights reserved | Privacy Policy | Terms and Conditions